2016 Projects
2016 Bondi Swiss Hotel supply builder ARMAGROUT C for grouting of 900 post tension truncations.
2016 Auburn Pool Completed 900m of ARMAFLEX Construction joint sealing to pools and balance tanks.
2016-2017 Fort Storage Leighton pl Hornsby extensive ARMAFLEX crack repairs to post tension slabs.
2016 Natures Care Belrose, Painted warehouse with Heavy duty MAIN-GRIP epoxy system.
2016 Renovation crack repairs of Waverton Coal Loader tunnel soffit. ARMAFLEX V repair with colour matching.