New Hornsby Aquatic Centre
ADHESIVE ENGINEERING completed 278 meters of RADMAT SPECIAL BUTYL RUBBER movement joints, in pool and through the structure of the new Hornsby Aquatic Centre completed May 2014. ADHESIVE ENGINEERING have installed the RADMAT system into 58 pools since 1982.