2017 Projects
2016-17 Gate Way Silverwater, Extensive ARMAFLEX repair to pavement areas.
2017 Pit concrete roof at Sydney Motor Sport Park, Patch 900 defects / spalls. RADMAT membrane to 2x 18m movement joints
2017 270m RADMAT movement joint to wall panels and pavement and 60m of cracks for Fujitsu Eastern Creek.
2017 Knight Frank Pavesi St Smithfield extensive ARMAFLEX floor repairs in transport terminal
2017 Castle Hill Shopping Centre, supply builder ARMAGROUT C for grouting post tension truncations.
2017 Removal of starting platforms at Blacktown Aquatic Centre. Re-tile with non-slip tiles.
2017 Apply Chemcoat KA Grey non-slip epoxy coating to pedestrian areas at Chiswick Wharf. approximately 170m2